Crane Operations
Know exactly when to operate cranes and optimize staff scheduling accordingly. Enhance safety by preparing ahead of time in the event of extreme weather.
Avoid crane damages of $2M - $5M per event
Location A
Location B
Insight In this Dashboard
severity - 3 sever
Consider Suspending Crane Operations: High Winds
Wind conditions are gusting above 20mph, this may pose a risk for crane operation. Use with caution and minimize operations.
severity - 2 moderate
Limit Crane Operations: Low Visibility
Limit crane operations until visibility improves
severity - 4 extreme
Postpone Operations: Heavy Rain
Delay any operations until after the rain clears.
severity - 4 extreme
Suspend Cranes: Lightning & Thunder Risk
Suspend crane operations! All staff should seek shelter. Monitor lightning activity, motion, directionality and speed 15 and 30 minutes into the future, based on distance from location.
severity - 4 extreme
Take Down Cranes: Extreme Winds
Take down cranes, boom retracted and lowered to horizontal.
severity - 0 unknown
Schedule Crane Operations: Optimal Conditions
Ideal conditions for operations.